Clevis

Clevis is your operating system for construction teams.

Connect projects, records, people, and agents. Then move the work that matters.

Explore platform
SC

Projects Documents Schedules Cost People AI agents

One place to understand the work. One place to move it.

Ask across projects, systems, and teams. Clevis answers with the records behind the answer, then helps the right person act without losing the thread.

PROJECT RECORDS

Grounded answers

Every response is connected to the company records that informed it.

FIELD HANDOFFS

Actions in context

Draft, assign, update, and escalate without losing the thread of the work.

APPROVAL GATE

Human judgment preserved

Sensitive decisions pause for approval before Clevis changes anything.

Your company already has the context. Clevis connects it.

Projects, documents, schedules, cost records, and decisions become one explainable company graph. The systems your teams rely on keep doing their jobs.

See how context works

Integrations

Connect the systems your company already uses and bring their work into one streamlined company experience.

Procore

Procore Technologies

Connect company portfolio context, documents, schedules, cost codes, field records, and project workflows without replacing the source system.

Microsoft Teams

Microsoft

Bring teams, channels, messages, meetings, and organization groups into Clevis workflows.

SharePoint

Microsoft

Discover sites and selected file metadata while keeping document content in Microsoft 365 by default.

Outlook

Microsoft

Connect mail, calendar events, contacts, and shared mailbox context with explicit user or company scope.

Sage

Sage Group

Connect accounting and ERP records through a Sage product-specific data contract selected during setup.

Microsoft Excel

Microsoft

Access workbook structure and selected table or worksheet ranges through governed actions.

Procore
Microsoft Teams
SharePoint
Outlook
Sage
Microsoft Excel
You

After today’s OAC, pull the open change, the cost codes it hits, and the owner conversation across systems.

Clevis Command

From today's OAC, the open item is CO-184 on Northline. It concentrates on cost codes 08 and 09, with the owner conversation still open in Teams and Outlook.

Company-linked change package

CO-184 · 4 systems · post-OAC

Procore
Sage
Microsoft Teams
Outlook
Procore

CO-184 · Northline

Scope change for Level 12 owner improvements

Sage

Cost codes 08 / 09

Forecast move vs committed package values

Microsoft Teams

OAC channel notes

Owner accepted direction; pending formal CO

Outlook

Owner recap thread

Meeting follow-up and next decision date

I can draft the CO package, attach code-level cost impact, or post the owner recap with the OAC notes linked.

You

Review RFI 042 against the latest drawings and draft a response.

Project Coordinator
  • Read RFI 042 and its current routing.

AI that works inside your controls, not around them.

Give specialized agents real work without giving up visibility. See every run, approval, and result from one operating center.

TOOL ACCESS

Project Coordinator

Workspace tool access

3 of 4 allowed
  • Read project documentsdocumentsRead indexed project files and their metadata.
  • Search RFIsproject controlsFind RFIs and their current routing.
  • Update RFIproject controlsUpdate an RFI response and status.
  • Manage commitmentscostCreate and update project commitments.

Bounded by permission

Agents only see and use the tools each workspace allows.

DECISION GATE

Designed for approval

High-impact actions wait for the right person, in the right context.

RUN RECORD

Run started

Project Coordinator began the requested work.

Jul 18, 3:42 PM

Auditable by default

Review what ran, which records were used, and what changed.

See the handoffs before they become delays.

The coordination timeline separates work that needs human judgment, continuous agent monitoring, or shared execution. Critical path and low-float signals stay visible inside the schedule your team already manages.

Phase 1 Baseline

Jul 11, 2026 – Aug 22, 2026

6-week Gantt
Activity
Jul 11
Jul 18
Jul 25
Aug 1
Aug 8
Aug 15
Aug 22

Know where the money is moving.

Budget, commitments, change exposure, invoices, and forecast live in one financial control surface. Every cost code keeps the current plan, committed value, forecast, and variance together.

Revised budget

$43.68M

Forecast final

$44.13M

Open exposure

$1.42M

$450K over
$0M$10M$20M$30M$40M$50MAprMayJunJulAugSepOctJULY MOVEMENT+$2.84M committed$3.40M cost postedForecast moved +$290K
Revised budgetCommittedCost to dateForecast final
You

Where is project cost moving this month?

Project Coordinator

Forecast final cost is $44.13M, currently $450K over the revised budget. Most of the movement is in mechanical systems and curtain wall. Open exposure is $1.42M, with $620K still pending.

Every file, with the context around it.

Clevis gives projects and company workspaces a real document library across uploads and connected systems. Teams can find, organize, preview, index, and act on the same records agents use.

All sourcesAll types
Project filesDrawings148 documents
NameFolderIndexedSourceUpdatedBySize
DrawingsIndexedUploadJul 18Sam Chen24.8 MB
RFIsIndexedGeneratedJul 18Project Coordinator1.2 MB
SubmittalsIndexedProcoreJul 17Maria Lopez8.4 MB
MeetingsIndexedOneDriveJul 16Sam Chen640 KB
Cost reportsIndexedSharePointJul 18Alex Morgan2.8 MB
You

What changed in the latest mechanical coordination set?

Project Coordinator

The July 18 set moves the Level 2 main duct 14 inches east to clear beam B-17. That change is connected to RFI 042, Submittal 23 05 93, and Drawing M-204. The RFI response is still awaiting approval.